Pre Contract Cost Control
  • Prepare and develop preliminary cost plan.
  • Advise on cost of design team’s proposals, including effects of site usage and alternative forms of design and construction as design develops.
  • Monitor cost implications during detailed design stage.
  • Maintain and develop cost plan, and prepare periodic reports and updated cash flow forecasts.